Triple
T3176141
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Meridian Gate |
E66469
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | palace gate |
C6652
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: palace gate Context triple: [Meridian Gate, instanceOf, palace gate]
-
A.
royal palace complex
A royal palace complex is an expansive, architecturally unified ensemble of residences, ceremonial halls, administrative buildings, gardens, and supporting structures that together serve as the political, cultural, and domestic center of a monarchy.
-
B.
entrance
chosen
An entrance is a designated point of access that allows people or objects to move from the outside into a defined space or area.
-
C.
wooden palace
A wooden palace is a grand, ornately designed residence or ceremonial building constructed primarily from timber, showcasing intricate craftsmanship and often reflecting the cultural and historical aesthetics of its region.
-
D.
triumphal arch
A triumphal arch is a monumental, freestanding structure with one or more arched passageways, built to commemorate significant victories, events, or individuals.
-
E.
ceremonial corridor
A ceremonial corridor is a formal, often architecturally embellished passageway designed to frame and elevate processions, rituals, or symbolic movement through a space.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8586a34c8190944c63ec11a8de1a |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:06 p.m.