Triple
T31756923
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Erie Canal waterfront (Fairport, New York) |
E810577
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | canal-side commercial district |
C23804
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: canal-side commercial district Context triple: [Erie Canal waterfront (Fairport, New York), instanceOf, canal-side commercial district]
-
A.
pedestrian-oriented commercial district
A pedestrian-oriented commercial district is a compact, walkable area where shops, services, and public spaces are clustered and designed primarily for people on foot rather than for automobile access.
-
B.
planned commercial district
A planned commercial district is a deliberately designed area designated for concentrated business, retail, and service activities, typically guided by zoning regulations and urban planning principles to support economic activity and accessibility.
-
C.
industrial district
An industrial district is a designated urban or regional area characterized by a high concentration of manufacturing, warehousing, and related industrial activities supported by specialized infrastructure and services.
-
D.
Commercial area
A commercial area is a designated zone within a city or region primarily used for business activities such as retail, offices, services, and entertainment.
-
E.
canal-side quarter
chosen
A canal-side quarter is an urban district organized along a canal, characterized by waterfront buildings, pedestrian promenades, and mixed residential, commercial, and recreational uses that engage directly with the waterway.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348e340d48190b780fae618c51464 |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 11:29 p.m.