Triple

T31716165
Position Surface form Disambiguated ID Type / Status
Subject Greater Boston coastal recreation areas E809461 entity
Predicate instanceOf P0 FINISHED
Object public open space network C13459 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public open space network
Context triple: [Greater Boston coastal recreation areas, instanceOf, public open space network]
  • A. public open space system chosen
    A public open space system is an interconnected network of accessible parks, plazas, greenways, and natural areas designed to support recreation, social interaction, ecological health, and urban livability for all community members.
  • B. spaceport network
    A spaceport network is an interconnected system of spaceports, supporting infrastructure, and operational protocols that collectively enable the efficient launch, landing, servicing, and transfer of spacecraft across multiple locations.
  • C. public event space
    A public event space is a designated area or facility accessible to the community that is designed to host gatherings, performances, meetings, and other organized activities.
  • D. NASA network
    A NASA network is an interconnected system of communication, data, and computing resources that links NASA’s spacecraft, ground stations, research centers, and partner organizations to support space missions and scientific operations.
  • E. space communication network
    A space communication network is an interconnected system of ground stations, satellites, and relay nodes that enables the reliable transmission, routing, and reception of data across space and between space-based and terrestrial assets.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348df4e048190a4a5a9932ada78d6 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 11:17 p.m.