Triple

T3167671
Position Surface form Disambiguated ID Type / Status
Subject Enterprise (TechCrunch section) E66251 entity
Predicate instanceOf P0 FINISHED
Object technology news section C1274 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: technology news section
Context triple: [Enterprise (TechCrunch section), instanceOf, technology news section]
  • A. technology magazine
    A technology magazine is a periodical publication that reports on, analyzes, and reviews current and emerging technologies, gadgets, software, and industry trends for a tech-interested audience.
  • B. technology blog chosen
    A technology blog is an online publication that regularly shares news, reviews, tutorials, and opinions about current and emerging technologies for a tech-interested audience.
  • C. business news section
    A business news section is a dedicated part of a publication or website that reports on companies, markets, the economy, and financial trends relevant to commerce and industry.
  • D. news aggregator
    A news aggregator is a system that automatically collects, organizes, and presents news articles and updates from multiple sources into a unified, easily accessible interface.
  • E. technology concept
    A technology concept is an abstract idea or blueprint that outlines how a particular technological solution, system, or innovation could function to address a specific need or problem.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8585d7988190af37365331093ccd completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:06 p.m.