Triple

T31664289
Position Surface form Disambiguated ID Type / Status
Subject National Highway Freight Network E808083 entity
Predicate instanceOf P0 FINISHED
Object freight transportation network C4130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: freight transportation network
Context triple: [National Highway Freight Network, instanceOf, freight transportation network]
  • A. freight railroad network
    A freight railroad network is an interconnected system of rail lines, terminals, and supporting infrastructure designed to transport goods and raw materials efficiently between industrial, commercial, and logistical hubs.
  • B. transport infrastructure network chosen
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • C. logistics network
    A logistics network is an interconnected system of facilities, transportation modes, and information flows designed to efficiently move goods from origin to destination while optimizing cost, time, and service quality.
  • D. freight transport sector
    The freight transport sector encompasses the systems, services, and infrastructure involved in moving goods by road, rail, sea, air, and inland waterways across local, regional, and global supply chains.
  • E. freight transport division
    The freight transport division is the organizational unit responsible for planning, managing, and executing the movement of goods and cargo across various transportation modes within a company or network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348dbeef4819080b446a7feb6340b completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 10:58 p.m.