Triple

T31597939
Position Surface form Disambiguated ID Type / Status
Subject SNCF Gares & Connexions E806269 entity
Predicate instanceOf P0 FINISHED
Object railway station management division C3982 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway station management division
Context triple: [SNCF Gares & Connexions, instanceOf, railway station management division]
  • A. railway station classification
    Railway station classification is the conceptual categorization of railway stations based on attributes such as size, passenger volume, services offered, and operational importance within a rail network.
  • B. railway station area
    A railway station area is the surrounding zone of a train station that includes platforms, tracks, access roads, passenger facilities, and adjacent public or commercial spaces supporting rail transport activities.
  • C. railway infrastructure manager chosen
    A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
  • D. train station
    A train station is a designated facility where trains regularly stop to pick up and drop off passengers and sometimes freight, typically featuring platforms, ticketing services, and waiting areas.
  • E. terminal station
    A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348d54ccc8190a03b5df9a2b40b25 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 10:31 p.m.