Triple
T315588
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | GMT800 |
E7698
|
entity |
| Predicate | successor |
P78
|
FINISHED |
| Object | GMT900 |
E8690
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GMT900 | Statement: [GMT800, successor, GMT900]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: GMT900 Context triple: [GMT800, successor, GMT900]
-
A.
GMT900
chosen
GMT900 is General Motors' full-size truck and SUV platform used for late-2000s models such as the Chevrolet Silverado and related vehicles.
-
B.
GMT800
GMT800 is General Motors' full-size truck and SUV platform introduced in the late 1990s, underpinning vehicles like the Chevrolet Silverado and GMC Sierra.
-
C.
GMT T1XX
GMT T1XX is General Motors' full-size truck and SUV platform underpinning the latest generation of vehicles like the Chevrolet Silverado.
-
D.
GBE
GBE is the highest grade of the Order of the British Empire, typically awarded for exceptionally distinguished service to the arts, sciences, public services, or charitable work.
-
E.
GMT
GMT (Greenwich Mean Time) is the mean solar time at the Royal Observatory in Greenwich, London, historically used as the international civil time standard and the basis for modern time zones.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e7e7af7881908890039d6be4e9b8 |
completed | Feb. 28, 2026, 1:04 p.m. |
| NER | Named-entity recognition | batch_69a2ea6462148190825acc57f6d2adaf |
completed | Feb. 28, 2026, 1:15 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69a3c41c00888190861d2b6d4bfc8904 |
completed | March 1, 2026, 4:44 a.m. |
Created at: Feb. 28, 2026, 1:08 p.m.