Triple

T31524348
Position Surface form Disambiguated ID Type / Status
Subject Cedar–Sammamish watershed E804294 entity
Predicate containsWaterBody P1778 FINISHED
Object Yesler Creek (Seattle)
Yesler Creek is a small urban stream in Seattle, Washington, that flows through residential neighborhoods and parkland before draining into Lake Washington.
E1976985 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Yesler Creek (Seattle) | Statement: [Cedar–Sammamish watershed, containsWaterBody, Yesler Creek (Seattle)]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Yesler Creek (Seattle)
Triple: [Cedar–Sammamish watershed, containsWaterBody, Yesler Creek (Seattle)]
Generated description
Yesler Creek is a small urban stream in Seattle, Washington, that flows through residential neighborhoods and parkland before draining into Lake Washington.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348cf839c81908657048402f7f97b completed April 30, 2026, 12:19 p.m.
NER Named-entity recognition batch_69f6a75f7f208190b788de11f8679645 completed May 3, 2026, 1:39 a.m.
NED1 Entity disambiguation (via context triple) batch_6a2b945a49a48190ab9bde63c52dc01c completed June 12, 2026, 5:08 a.m.
NEDg Description generation batch_6a2d5e897150819082bbeea3a5e8a820 completed June 13, 2026, 1:43 p.m.
NED2 Entity disambiguation (via description) batch_6a2d5f804bf88190bbf0f3ac86cc8c9d completed June 13, 2026, 1:47 p.m.
Created at: April 30, 2026, 9:57 p.m.