Triple
T3150673
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Queensboro Bridge (Queens side) |
E65869
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge segment |
C8862
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge segment Context triple: [Queensboro Bridge (Queens side), instanceOf, bridge segment]
-
A.
bridge approach
chosen
A bridge approach is the section of roadway that transitions between the ground and the main span of a bridge, providing a smooth and stable connection for vehicles and pedestrians.
-
B.
bridge network
A bridge network is a system of interconnected bridges and links that provides multiple paths for traffic or data to travel between nodes, enhancing reliability and load distribution.
-
C.
bridge complex
A bridge complex is a molecular assembly that physically links two distinct cellular structures or regions, facilitating communication, transport, or mechanical coupling between them.
-
D.
toll bridge
A toll bridge is a bridge where users must pay a fee to cross, typically to fund its construction, maintenance, or operation.
-
E.
cross-sea bridge
A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8584485081909ed529e890cadc4a |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:05 p.m.