Triple
T31486293
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | London 2012 Olympic legacy masterplan |
E803285
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | post-Olympic legacy plan |
C36896
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: post-Olympic legacy plan Context triple: [London 2012 Olympic legacy masterplan, instanceOf, post-Olympic legacy plan]
-
A.
Olympic legacy plan
chosen
An Olympic legacy plan is a strategic framework designed to ensure that the long-term social, economic, environmental, and infrastructural benefits of hosting the Olympic Games are realized and sustained for the host city and nation.
-
B.
Olympic legacy organization
An Olympic legacy organization is an entity dedicated to preserving, managing, and enhancing the long-term social, economic, and environmental benefits of hosting the Olympic Games for the host city, region, and nation.
-
C.
sports event legacy strategy
A sports event legacy strategy is a long-term, planned approach to ensure that hosting a sporting event delivers enduring social, economic, environmental, and infrastructural benefits for the host community well beyond the event itself.
-
D.
post-Olympic tour
A post-Olympic tour is a series of exhibition events in which Olympic athletes travel to various locations after the Games to perform, compete in non-official showcases, and engage with fans and sponsors.
-
E.
planned mega-event
A planned mega-event is a large-scale, one-time or infrequent gathering, such as a major sporting, cultural, or political event, that is scheduled in advance and designed to attract substantial international attention, visitors, and investment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348ca04508190ba9379b5329dfd75 |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 9:35 p.m.