Triple

T31477650
Position Surface form Disambiguated ID Type / Status
Subject National Scenic Riverway E803041 entity
Predicate instanceOf P0 FINISHED
Object river corridor protection program C51120 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: river corridor protection program
Context triple: [National Scenic Riverway, instanceOf, river corridor protection program]
  • A. river protection program chosen
    A river protection program is an organized initiative that plans, implements, and monitors actions to preserve and restore the ecological health, water quality, and sustainable use of river systems.
  • B. river conservancy
    River conservancy is the management and protection of river ecosystems through planning, regulation, restoration, and sustainable use to maintain their ecological health and benefits to society.
  • C. river corridor
    A river corridor is the linear landscape surrounding a river, including its channel, banks, floodplain, and adjacent habitats, through which water, sediment, organisms, and energy flow and interact.
  • D. stream corridor
    A stream corridor is the linear landscape zone encompassing a stream and its adjacent floodplain, vegetation, and associated habitats that together influence the stream’s hydrology, ecology, and geomorphology.
  • E. riverine sanctuary
    A riverine sanctuary is a protected natural area centered around a river and its surrounding ecosystems, preserving aquatic and riparian habitats while supporting biodiversity and sustainable human use.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348c9477c8190bc0a21f6d482d2fc completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 9:30 p.m.