Triple

T31475187
Position Surface form Disambiguated ID Type / Status
Subject IQ-quarter E802971 entity
Predicate instanceOf P0 FINISHED
Object high-rise development C24876 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-rise development
Context triple: [IQ-quarter, instanceOf, high-rise development]
  • A. high-rise development program
    A high-rise development program is a coordinated set of policies, plans, and projects that guide the financing, design, construction, and long-term management of tall multi-story buildings within a defined urban area.
  • B. high‑rise building
    A high-rise building is a tall, multi-story structure designed to accommodate residential, commercial, or mixed-use functions, typically requiring vertical transportation systems such as elevators.
  • C. high-rise district chosen
    A high-rise district is an urban area characterized by a dense concentration of tall, multi-story buildings used for residential, commercial, or mixed purposes.
  • D. commercial high-rise
    A commercial high-rise is a tall, multi-story building primarily designed and constructed to house businesses, offices, and other commercial activities within an urban environment.
  • E. super­tall building
    A supertall building is an exceptionally high skyscraper, typically exceeding 300 meters (984 feet) in height, designed to accommodate mixed uses such as offices, residences, and public spaces within a highly vertical structure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348c9477c8190bc0a21f6d482d2fc completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 9:28 p.m.