Triple
T31421413
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | A7 north–south corridor |
E801539
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | long-distance traffic axis |
C492
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: long-distance traffic axis Context triple: [A7 north–south corridor, instanceOf, long-distance traffic axis]
-
A.
road transportation corridor
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
-
B.
highway system
A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
-
C.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
D.
motorway
A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
-
E.
north–south highway
chosen
A north–south highway is a major roadway that primarily runs in a longitudinal direction, connecting regions or cities along a north-to-south axis.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348c26f048190b4adadd71b4596c5 |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 8:48 p.m.