Triple
T31389254
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Thneed factory |
E800685
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | fictional industrial facility |
C44429
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: fictional industrial facility Context triple: [Thneed factory, instanceOf, fictional industrial facility]
-
A.
fictional factory
chosen
A fictional factory is an imagined industrial facility, often depicted in stories or media, where goods, ideas, or fantastical items are produced under unique or extraordinary conditions.
-
B.
fictional power plant
A fictional power plant is an imagined facility that generates and distributes energy within a narrative world, often using speculative technologies or fantastical resources to power societies, devices, or plot events.
-
C.
fictional medical facility
A fictional medical facility is an imagined healthcare institution, such as a hospital, clinic, or research center, created within a narrative to provide a setting for medical treatment, ethical dilemmas, and character interactions.
-
D.
former industrial plant
A former industrial plant is a decommissioned facility that once housed large-scale manufacturing or processing operations, often leaving behind substantial physical infrastructure and potential environmental impacts.
-
E.
industrial plant
An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224e9d7048190b0cc20f9071bd3e4 |
completed | April 29, 2026, 3:34 p.m. |
Created at: April 29, 2026, 9:19 p.m.