Triple

T31363739
Position Surface form Disambiguated ID Type / Status
Subject Midtown Manhattan pedestrian network E799949 entity
Predicate instanceOf P0 FINISHED
Object underground concourse network C4955 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: underground concourse network
Context triple: [Midtown Manhattan pedestrian network, instanceOf, underground concourse network]
  • A. underground network
    An underground network is a covert, often informal system of interconnected individuals, groups, or infrastructure that operates out of public view to share resources, information, or influence.
  • B. underground structure chosen
    An underground structure is a man-made construction built below the earth’s surface to provide space, protection, or support for various human activities or infrastructure.
  • C. underground metro station
    An underground metro station is a subterranean transit facility where passengers access, board, and disembark metro trains via platforms connected to the surface by tunnels, stairs, escalators, and elevators.
  • D. underground rail corridor
    An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
  • E. ropeway
    A ropeway is an aerial transport system in which carriers such as cabins or chairs are suspended from and moved by one or more overhead cables between fixed terminals.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224e6b7448190ac6bf97ad7364160 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 9:18 p.m.