Triple

T3135981
Position Surface form Disambiguated ID Type / Status
Subject Cambridge South railway station E65530 entity
Predicate instanceOf P0 FINISHED
Object planned transport infrastructure project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned transport infrastructure project
Context triple: [Cambridge South railway station, instanceOf, planned transport infrastructure project]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • C. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • D. regional transport plan
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • E. proposed high-speed ground transportation system
    A proposed high-speed ground transportation system is a conceptual network of advanced vehicles, infrastructure, and control technologies designed to move passengers or freight rapidly and efficiently between destinations along dedicated terrestrial corridors.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8581c25c8190b0d85ba9b9baa531 completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:05 p.m.