Triple
T3135981
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cambridge South railway station |
E65530
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned transport infrastructure project |
C2938
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned transport infrastructure project Context triple: [Cambridge South railway station, instanceOf, planned transport infrastructure project]
-
A.
infrastructure project
chosen
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
B.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
C.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
D.
regional transport plan
A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
-
E.
proposed high-speed ground transportation system
A proposed high-speed ground transportation system is a conceptual network of advanced vehicles, infrastructure, and control technologies designed to move passengers or freight rapidly and efficiently between destinations along dedicated terrestrial corridors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8581c25c8190b0d85ba9b9baa531 |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:05 p.m.