Triple

T3130980
Position Surface form Disambiguated ID Type / Status
Subject Interim Cryogenic Propulsion Stage E65412 entity
Predicate instanceOf P0 FINISHED
Object spacecraft propulsion module C10210 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spacecraft propulsion module
Context triple: [Interim Cryogenic Propulsion Stage, instanceOf, spacecraft propulsion module]
  • A. spacecraft propulsion concept
    A spacecraft propulsion concept is a theoretical or practical method for generating thrust to maneuver a spacecraft in space, encompassing the underlying physics, required systems, and performance characteristics.
  • B. spacecraft
    A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
  • C. rocket booster
    A rocket booster is a powerful propulsion component that provides the initial thrust needed to lift a launch vehicle off the ground and accelerate it through the early stages of flight.
  • D. rocket upper stage chosen
    A rocket upper stage is the final propulsion segment of a launch vehicle, designed to operate in near-vacuum conditions to place payloads into their intended orbits or trajectories after lower stages have completed initial ascent.
  • E. nuclear pulse propulsion system
    A nuclear pulse propulsion system is a spacecraft propulsion method that generates thrust by detonating a series of small nuclear explosives behind the vehicle and transferring the resulting impulse through a robust pusher plate and shock-absorbing structure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8581c25c8190b0d85ba9b9baa531 completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:04 p.m.