Triple

T31264789
Position Surface form Disambiguated ID Type / Status
Subject Olga (Führerhauptquartier) E797222 entity
Predicate instanceOf P0 FINISHED
Object Führerhauptquartier C57432 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Führerhauptquartier
Context triple: [Olga (Führerhauptquartier), instanceOf, Führerhauptquartier]
  • A. Führer Headquarters chosen
    The Führer Headquarters were a series of heavily fortified command complexes used by Adolf Hitler and the Nazi leadership during World War II to plan and direct military operations.
  • B. Wehrmacht headquarters
    The Wehrmacht headquarters was the central command authority of Nazi Germany's unified armed forces, responsible for strategic planning, coordination, and direction of military operations during World War II.
  • C. Gestapo prison
    A Gestapo prison is a detention facility operated by Nazi Germany’s secret state police, used to incarcerate, interrogate, and torture political opponents, resistance members, and other targeted groups.
  • D. Nazi SS office
    A Nazi SS office was an administrative and operational unit of the Schutzstaffel responsible for planning, coordinating, and executing the regime’s ideological, security, and genocidal policies.
  • E. Gericht der NS-Zeit
    Ein Gericht der NS-Zeit ist eine staatliche Justizinstanz im nationalsozialistischen Deutschland, die formal Recht sprach, tatsächlich jedoch als politisches Unterdrückungsinstrument zur Durchsetzung der NS-Ideologie und Verfolgung von Regimegegnern diente.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224de2bbc819081af6c32e1d857b9 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 9:12 p.m.