Triple

T31248371
Position Surface form Disambiguated ID Type / Status
Subject كوبري قصر النيل E796749 entity
Predicate instanceOf P0 FINISHED
Object جسر C47958 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: جسر
Context triple: [كوبري قصر النيل, instanceOf, جسر]
  • A. 교량 chosen
    교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
  • B. river bridge
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • C. разводной мост
    Разводной мост — это мостовая конструкция с подвижными пролетами, которые могут подниматься или раздвигаться для пропуска судов по водному пути.
  • D. dam bridge
    A dam bridge is a structure that combines the functions of a dam for water retention and control with a bridge that provides a transportation route across the impounded water or river.
  • E. Ottoman bridge
    An Ottoman bridge is a stone or masonry arch bridge built during the Ottoman Empire, typically featuring elegant arches, narrow decks, and often serving as both a transportation route and a social or commercial gathering space.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224dc84d0819081f1cb6f9127e6b1 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 9:11 p.m.