Triple

T31241920
Position Surface form Disambiguated ID Type / Status
Subject Kerr-McGee Cimarron Fuel Fabrication Site E796583 entity
Predicate instanceOf P0 FINISHED
Object nuclear fuel fabrication plant C16043 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear fuel fabrication plant
Context triple: [Kerr-McGee Cimarron Fuel Fabrication Site, instanceOf, nuclear fuel fabrication plant]
  • A. uranium processing facility chosen
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • B. uranium enrichment facility
    A uranium enrichment facility is an industrial complex that increases the concentration of the fissile isotope U-235 in uranium to produce fuel for nuclear reactors or material for nuclear weapons.
  • C. nuclear weapons component plant
    A nuclear weapons component plant is an industrial facility dedicated to designing, manufacturing, and assembling specialized parts and subsystems used in the construction and maintenance of nuclear weapons.
  • D. nuclear weapons assembly plant
    A nuclear weapons assembly plant is a highly secure industrial facility where nuclear and non-nuclear components are manufactured, integrated, and tested to produce complete nuclear weapons in compliance with strict safety, security, and regulatory standards.
  • E. weapons-grade plutonium production facility
    A weapons-grade plutonium production facility is an industrial complex designed to produce, extract, and process plutonium with isotopic compositions suitable for use in nuclear weapons.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224db69ac81909a370adad6a7ac7c completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 9:11 p.m.