Triple

T3116359
Position Surface form Disambiguated ID Type / Status
Subject Purvanchal Expressway E65070 entity
Predicate connectsToExpressway P845 FINISHED
Object Agra–Lucknow Expressway E64963 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Agra–Lucknow Expressway | Statement: [Purvanchal Expressway, connectsToExpressway, Agra–Lucknow Expressway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Agra–Lucknow Expressway
Context triple: [Purvanchal Expressway, connectsToExpressway, Agra–Lucknow Expressway]
  • A. Agra–Lucknow Expressway chosen
    The Agra–Lucknow Expressway is a major six-lane, access-controlled expressway in India that significantly reduces travel time between Agra and the state capital Lucknow and serves as a key transport and economic corridor in Uttar Pradesh.
  • B. Bundelkhand Expressway
    Bundelkhand Expressway is a major access-controlled highway in India that connects the Bundelkhand region to key economic and administrative centers in Uttar Pradesh, improving regional connectivity and development.
  • C. Purvanchal Expressway
    Purvanchal Expressway is a major access-controlled expressway in northern India that enhances connectivity across eastern Uttar Pradesh, linking rural regions with key urban and economic centers.
  • D. Delhi–Meerut Expressway
    The Delhi–Meerut Expressway is a high-speed, access-controlled highway in northern India designed to significantly reduce travel time and improve connectivity between Delhi and the city of Meerut.
  • E. Delhi–Mumbai Expressway
    The Delhi–Mumbai Expressway is a major under-construction, high-speed, access-controlled highway designed to significantly reduce travel time and boost connectivity between India’s national capital, Delhi, and its financial hub, Mumbai.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: connectsToExpressway
Context triple: [Purvanchal Expressway, connectsToExpressway, Agra–Lucknow Expressway]
  • A. connectsTo chosen
    Indicates a relationship where one entity is linked or joined to another, allowing interaction, communication, or transfer between them.
  • B. connectionTo
    Indicates a relationship in which one entity is linked, associated, or otherwise related to another entity.
  • C. connectsState
    Indicates a relationship where one entity serves as a link or conduit between different states, conditions, or statuses of another entity.
  • D. connectsDestinationType
    Indicates that one entity serves as a connection or link specifically to a destination of a given type.
  • E. connectionEstablishmentMethod
    Indicates the method or mechanism by which a connection between entities is initiated or established.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad857fcc088190b0c4d45a5cde6f61 completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69ada4e5d1488190a2ab199625fdf05d completed March 8, 2026, 4:33 p.m.
NED1 Entity disambiguation (via context triple) batch_69b235a8949881908496a1413ffa2658 completed March 12, 2026, 3:40 a.m.
PD Predicate disambiguation batch_69ad9df455088190940ad04419772dc8 completed March 8, 2026, 4:04 p.m.
Created at: March 8, 2026, 3:04 p.m.