Triple

T3116308
Position Surface form Disambiguated ID Type / Status
Subject Purvanchal Expressway E65070 entity
Predicate instanceOf P0 FINISHED
Object access-controlled expressway C3932 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: access-controlled expressway
Context triple: [Purvanchal Expressway, instanceOf, access-controlled expressway]
  • A. controlled-access highway chosen
    A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
  • B. high-occupancy toll lanes
    High-occupancy toll lanes are special highway lanes that allow vehicles with multiple occupants to travel for free or at reduced cost while single-occupant vehicles can use them by paying a variable toll designed to manage congestion and maintain faster traffic flow.
  • C. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • D. toll highway
    A toll highway is a high-speed road where drivers must pay a fee, typically at toll booths or electronically, to use the roadway for travel.
  • E. toll road
    A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad857fcc088190b0c4d45a5cde6f61 completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:04 p.m.