Triple

T3110913
Position Surface form Disambiguated ID Type / Status
Subject Tavira railway station E64947 entity
Predicate locatedOn P40 FINISHED
Object Algarve line E10468 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Algarve line | Statement: [Tavira railway station, locatedOn, Algarve line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Algarve line
Context triple: [Tavira railway station, locatedOn, Algarve line]
  • A. Algarve line chosen
    The Algarve line is a major railway route in southern Portugal that connects the region’s coastal towns and cities along the Algarve.
  • B. Linha de Cascais
    Linha de Cascais is a coastal suburban railway line in the Lisbon metropolitan area of Portugal, connecting central Lisbon to the seaside town of Cascais.
  • C. Linha de Sintra
    Linha de Sintra is a heavily used suburban railway line serving commuter traffic between Lisbon and the Sintra region in Portugal.
  • D. Linha do Alentejo
    Linha do Alentejo is a Portuguese railway line that connects Lisbon to the Alentejo region, serving as an important route for both passenger and freight transport in southern Portugal.
  • E. Linha de Leixões
    Linha de Leixões is a freight-focused railway line in the Porto metropolitan area of Portugal, connecting the Port of Leixões with the national rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad857eeaf48190b34ebfdaa7a264cf completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69ada43954f0819096a96331bf3c53a8 completed March 8, 2026, 4:30 p.m.
NED1 Entity disambiguation (via context triple) batch_69b20f5cfc7c8190b867794c0e9a271e completed March 12, 2026, 12:57 a.m.
Created at: March 8, 2026, 3:04 p.m.