Triple

T310968
Position Surface form Disambiguated ID Type / Status
Subject C Reactor E7605 entity
Predicate precededBy P97 FINISHED
Object B Reactor E5892 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: B Reactor | Statement: [C Reactor, precededBy, B Reactor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: B Reactor
Context triple: [C Reactor, precededBy, B Reactor]
  • A. B Reactor chosen
    B Reactor is the world’s first full-scale plutonium production reactor, built during the Manhattan Project at the Hanford Site in Washington State.
  • B. H Reactor
    H Reactor was one of the plutonium-producing nuclear reactors at the Hanford Site in Washington, built during the Cold War as part of the U.S. nuclear weapons program.
  • C. N Reactor
    N Reactor was a dual-purpose plutonium production and power-generating nuclear reactor at the Hanford Site in Washington, notable for its graphite-moderated, water-cooled design and role in the U.S. Cold War weapons program.
  • D. D Reactor
    D Reactor was one of the early plutonium production reactors at the Hanford Site in Washington, built during the Manhattan Project to support the U.S. nuclear weapons program.
  • E. F Reactor
    F Reactor was one of the early plutonium production reactors at the Hanford Site in Washington, built during the Manhattan Project to support the U.S. nuclear weapons program.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7e7af7881908890039d6be4e9b8 completed Feb. 28, 2026, 1:04 p.m.
NER Named-entity recognition batch_69a2ea49636c8190a69cbd951fc0a4db completed Feb. 28, 2026, 1:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69a3bc277528819096184b6cc6b98ae2 completed March 1, 2026, 4:10 a.m.
Created at: Feb. 28, 2026, 1:07 p.m.