Triple
T31028101
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sant Antoni Dam |
E790637
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water regulation infrastructure |
C5154
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water regulation infrastructure Context triple: [Sant Antoni Dam, instanceOf, water regulation infrastructure]
-
A.
water infrastructure
Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
-
B.
water management structure
chosen
A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
-
C.
flood control facility
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
-
D.
drinking water infrastructure
Drinking water infrastructure comprises the interconnected systems, facilities, and technologies used to source, treat, store, and distribute safe potable water to consumers.
-
E.
canal infrastructure
Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224c97a788190b5da1ead6038a74e |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:58 p.m.