Triple

T31026821
Position Surface form Disambiguated ID Type / Status
Subject Ho Chi Minh City Metro E790599 entity
Predicate plannedSignalling P181676 FINISHED
Object modern automatic signalling LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: modern automatic signalling | Statement: [Ho Chi Minh City Metro, plannedSignalling, modern automatic signalling]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedSignalling
Context triple: [Ho Chi Minh City Metro, plannedSignalling, modern automatic signalling]
  • A. plannedTransit
    Indicates that a transit or trip has been scheduled or arranged to occur, but has not yet taken place.
  • B. plannedVia
    Indicates that something is arranged, organized, or scheduled by means of a particular method, process, or intermediary.
  • C. plannedMode
    Indicates that a particular mode, method, or state has been intentionally selected or scheduled in advance for use.
  • D. stationPlanned
    Indicates that a station is intended or scheduled to be built or established in the future.
  • E. plannedIn
    Indicates that an event, activity, or process is scheduled or arranged to occur within a specific context, timeframe, or plan.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c811508190a7de096a5b1f5798 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f7805ce6208190ac6dbd9c97989978 completed May 3, 2026, 5:05 p.m.
PD Predicate disambiguation batch_69f77956ec648190ba4fb7e9d83fd107 completed May 3, 2026, 4:35 p.m.
PDg Predicate description generation batch_69f7805c25dc8190b9977c561ba15975 completed May 3, 2026, 5:05 p.m.
Created at: April 29, 2026, 8:58 p.m.