Triple

T31012406
Position Surface form Disambiguated ID Type / Status
Subject ETCS Level 3 E790241 entity
Predicate instanceOf P0 FINISHED
Object railway signalling standard C17465 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway signalling standard
Context triple: [ETCS Level 3, instanceOf, railway signalling standard]
  • A. railway signaling system
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • B. railway technical standard chosen
    A railway technical standard is a formalized set of specifications and requirements that define the design, construction, operation, and maintenance criteria for railway systems to ensure safety, interoperability, and performance.
  • C. standardized rail interface
    A standardized rail interface is a uniform physical and electrical connection system that allows different rail vehicles, components, or infrastructure elements to interoperate safely and efficiently across multiple networks or manufacturers.
  • D. railway locomotive standardization scheme
    A railway locomotive standardization scheme is a systematic framework for defining, organizing, and unifying the design, classification, and specifications of locomotives across a rail network to ensure compatibility, efficiency, and ease of maintenance.
  • E. railway communication system
    A railway communication system is an integrated network of technologies and protocols that enable real-time exchange of information between trains, trackside equipment, and control centers to ensure safe, efficient, and coordinated railway operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c73ca48190a1e46cb58ad4045b completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:57 p.m.