Triple

T31004423
Position Surface form Disambiguated ID Type / Status
Subject Alfred Dock E790028 entity
Predicate instanceOf P0 FINISHED
Object commercial dock facility C53972 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: commercial dock facility
Context triple: [Alfred Dock, instanceOf, commercial dock facility]
  • A. docking facility
    A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
  • B. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • C. port facility complex chosen
    A port facility complex is an integrated area of land and water with infrastructure, equipment, and services designed to support the berthing, loading, unloading, storage, and transfer of cargo and passengers between sea and land transport modes.
  • D. maritime warehouse
    A maritime warehouse is a specialized storage facility located at or near a port, designed to handle, protect, and manage goods transported by sea, including loading, unloading, and temporary holding of cargo.
  • E. former port facility
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c73ca48190a1e46cb58ad4045b completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:57 p.m.