Triple

T3098180
Position Surface form Disambiguated ID Type / Status
Subject Port of Ponta Delgada E64650 entity
Predicate instanceOf P0 FINISHED
Object passenger port C452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: passenger port
Context triple: [Port of Ponta Delgada, instanceOf, passenger port]
  • A. port authority
    A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
  • B. seaport chosen
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • C. passenger ferry
    A passenger ferry is a vessel designed to transport people, and sometimes light vehicles or cargo, across bodies of water on regular, short-distance routes.
  • D. ferry terminal
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • E. inland port
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad857dc98481909e585dc3372e3ed5 completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:03 p.m.