Triple

T3097180
Position Surface form Disambiguated ID Type / Status
Subject NRG Stadium E64624 entity
Predicate structuralEngineer P616 FINISHED
Object Walter P Moore E222457 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Walter P Moore | Statement: [NRG Stadium, structuralEngineer, Walter P Moore]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Walter P Moore
Context triple: [NRG Stadium, structuralEngineer, Walter P Moore]
  • A. Walter P Moore
    Walter P Moore is a global engineering firm known for its expertise in structural engineering and innovative design solutions for major sports venues and other complex structures.
  • B. Parsons Brinckerhoff
    Parsons Brinckerhoff is a global engineering and professional services firm known for its major infrastructure and transportation projects.
  • C. Leslie E. Robertson Associates
    Leslie E. Robertson Associates is a prominent structural engineering firm known for its innovative design of high-rise and complex structures worldwide.
  • D. William L. Pereira & Associates
    William L. Pereira & Associates was a prominent 20th-century American architectural and urban planning firm known for its futuristic, modernist designs and large-scale master planning projects.
  • E. Walter P. Moore chosen
    Walter P. Moore was a prominent American structural engineer known for pioneering work on large-span sports facilities and innovative stadium designs.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad857dc98481909e585dc3372e3ed5 completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69ada23cbe3c8190b7ec5cfd464a1ca8 completed March 8, 2026, 4:22 p.m.
NED1 Entity disambiguation (via context triple) batch_69b20378a1488190bd0fa7d3f4639220 completed March 12, 2026, 12:06 a.m.
Created at: March 8, 2026, 3:03 p.m.