Triple

T30967366
Position Surface form Disambiguated ID Type / Status
Subject North Rhyl Offshore Wind Farm (planned) E788994 entity
Predicate gridConnectionType P1374 FINISHED
Object offshore to onshore transmission LITERAL FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: offshore to onshore transmission | Statement: [North Rhyl Offshore Wind Farm (planned), gridConnectionType, offshore to onshore transmission]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c3a6b48190951add9b7b7f0271 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f6938596a4819088301e25e753a4db completed May 3, 2026, 12:15 a.m.
Created at: April 29, 2026, 8:54 p.m.