Triple

T30901678
Position Surface form Disambiguated ID Type / Status
Subject Drogden Tunnel E787186 entity
Predicate instanceOf P0 FINISHED
Object road-rail tunnel C12485 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road-rail tunnel
Context triple: [Drogden Tunnel, instanceOf, road-rail tunnel]
  • A. road tunnel
    A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
  • B. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • C. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • D. combined road and rail bridge–tunnel chosen
    A combined road and rail bridge–tunnel is a hybrid transportation structure that integrates both bridge and tunnel segments to carry vehicular and rail traffic across or under a geographic obstacle such as a body of water or valley.
  • E. road–rail embankment
    A road–rail embankment is an elevated earth or engineered structure designed to simultaneously support and separate both roadway and railway transport corridors above the surrounding ground level.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224bcbcb48190836df847424e4057 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:50 p.m.