Triple

T30870984
Position Surface form Disambiguated ID Type / Status
Subject San Martín Line (Buenos Aires commuter rail) E786335 entity
Predicate upgradeProjects P170584 FINISHED
Object planned electrification LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: planned electrification | Statement: [San Martín Line (Buenos Aires commuter rail), upgradeProjects, planned electrification]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: upgradeProjects
Context triple: [San Martín Line (Buenos Aires commuter rail), upgradeProjects, planned electrification]
  • A. upgradeProject
    Indicates performing actions that improve or enhance an existing project, typically by updating its components, capabilities, or quality.
  • B. upgradePath
    Indicates the relationship by which one entity can be improved, enhanced, or transitioned into another, typically more advanced, version or state.
  • C. upgradeProgram
    Indicates that one entity improves, enhances, or replaces another entity’s program with a more advanced or updated version.
  • D. upgradeMethod
    Indicates the method or process by which something is improved, updated, or elevated to a higher level or version.
  • E. upgradeGoal
    Indicates that an entity has a target or intended improvement to a higher level, version, or state relative to its current condition.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224b9df2c819086f55f8bcf7f382e completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f691d1c75c8190a447d06787e5e2ae completed May 3, 2026, 12:07 a.m.
PD Predicate disambiguation batch_69f68b7d2794819092fef8a63f4f3de8 completed May 2, 2026, 11:40 p.m.
PDg Predicate description generation batch_69f68fb914b88190b0cad83ea9fe9dfc completed May 2, 2026, 11:58 p.m.
Created at: April 29, 2026, 8:48 p.m.