Triple

T30851287
Position Surface form Disambiguated ID Type / Status
Subject Craighead County, Arkansas E785786 entity
Predicate majorHighway P385 FINISHED
Object Interstate 555
Interstate 555 is a U.S. Interstate highway in northeastern Arkansas that connects the city of Jonesboro to Interstate 55 near Turrell, improving regional access and transportation.
E2293263 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 555 | Statement: [Craighead County, Arkansas, majorHighway, Interstate 555]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 555
Triple: [Craighead County, Arkansas, majorHighway, Interstate 555]
Generated description
Interstate 555 is a U.S. Interstate highway in northeastern Arkansas that connects the city of Jonesboro to Interstate 55 near Turrell, improving regional access and transportation.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224b850848190a4af4ccf8ddadcdf completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f6917c8d8c8190b4091f3ef57834bb completed May 3, 2026, 12:06 a.m.
NED1 Entity disambiguation (via context triple) batch_6a7a82074cf081908a11b29061b05d80 completed Aug. 11, 2026, 1:59 a.m.
NEDg Description generation batch_6a7a827ca7f48190a8030ef5fa00236c completed Aug. 11, 2026, 2:01 a.m.
NED2 Entity disambiguation (via description) batch_6a7a82c1908c8190993df247f038f2a3 completed Aug. 11, 2026, 2:02 a.m.
Created at: April 29, 2026, 8:46 p.m.