Triple
T3085064
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Noida International Airport |
E64350
|
entity |
| Predicate | connectedPlannedInfrastructure |
P43089
|
FINISHED |
| Object |
Delhi–Mumbai Expressway
The Delhi–Mumbai Expressway is a major under-construction, high-speed, access-controlled highway designed to significantly reduce travel time and boost connectivity between India’s national capital, Delhi, and its financial hub, Mumbai.
|
E324718
|
NE FINISHED |
How this triple was built (5 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Delhi–Mumbai Expressway | Statement: [Noida International Airport, connectedPlannedInfrastructure, Delhi–Mumbai Expressway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Delhi–Mumbai Expressway Context triple: [Noida International Airport, connectedPlannedInfrastructure, Delhi–Mumbai Expressway]
-
A.
Delhi–Meerut Expressway
The Delhi–Meerut Expressway is a high-speed, access-controlled highway in northern India designed to significantly reduce travel time and improve connectivity between Delhi and the city of Meerut.
-
B.
Bundelkhand Expressway
Bundelkhand Expressway is a major access-controlled highway in India that connects the Bundelkhand region to key economic and administrative centers in Uttar Pradesh, improving regional connectivity and development.
-
C.
Agra–Lucknow Expressway
The Agra–Lucknow Expressway is a major six-lane, access-controlled expressway in India that significantly reduces travel time between Agra and the state capital Lucknow and serves as a key transport and economic corridor in Uttar Pradesh.
-
D.
Yamuna Expressway
The Yamuna Expressway is a high-speed, six-lane toll road in northern India that connects Greater Noida with Agra, significantly reducing travel time between Delhi and the Taj Mahal region.
-
E.
Purvanchal Expressway
Purvanchal Expressway is a major access-controlled expressway in northern India that enhances connectivity across eastern Uttar Pradesh, linking rural regions with key urban and economic centers.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Delhi–Mumbai Expressway Triple: [Noida International Airport, connectedPlannedInfrastructure, Delhi–Mumbai Expressway]
Generated description
The Delhi–Mumbai Expressway is a major under-construction, high-speed, access-controlled highway designed to significantly reduce travel time and boost connectivity between India’s national capital, Delhi, and its financial hub, Mumbai.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Delhi–Mumbai Expressway Target entity description: The Delhi–Mumbai Expressway is a major under-construction, high-speed, access-controlled highway designed to significantly reduce travel time and boost connectivity between India’s national capital, Delhi, and its financial hub, Mumbai.
-
A.
Delhi–Meerut Expressway
The Delhi–Meerut Expressway is a high-speed, access-controlled highway in northern India designed to significantly reduce travel time and improve connectivity between Delhi and the city of Meerut.
-
B.
Bundelkhand Expressway
Bundelkhand Expressway is a major access-controlled highway in India that connects the Bundelkhand region to key economic and administrative centers in Uttar Pradesh, improving regional connectivity and development.
-
C.
Agra–Lucknow Expressway
The Agra–Lucknow Expressway is a major six-lane, access-controlled expressway in India that significantly reduces travel time between Agra and the state capital Lucknow and serves as a key transport and economic corridor in Uttar Pradesh.
-
D.
Yamuna Expressway
The Yamuna Expressway is a high-speed, six-lane toll road in northern India that connects Greater Noida with Agra, significantly reducing travel time between Delhi and the Taj Mahal region.
-
E.
Purvanchal Expressway
Purvanchal Expressway is a major access-controlled expressway in northern India that enhances connectivity across eastern Uttar Pradesh, linking rural regions with key urban and economic centers.
- F. None of above. chosen
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: connectedPlannedInfrastructure Context triple: [Noida International Airport, connectedPlannedInfrastructure, Delhi–Mumbai Expressway]
-
A.
relatedInfrastructure
chosen
Indicates that one piece of infrastructure is connected, associated, or functionally related to another infrastructure element.
-
B.
plannedFacility
Indicates that a facility is intended or scheduled to be built, established, or implemented in the future but does not yet exist or operate.
-
C.
parallelInfrastructure
Indicates that two or more infrastructure elements are arranged or operate in parallel to each other, typically serving similar functions simultaneously.
-
D.
isPartOfInfrastructure
Indicates that something belongs to, is included within, or functions as a component of a larger infrastructure system.
-
E.
plannedDevelopment
Indicates that one entity has been designated or scheduled for future development or construction by another entity.
- F. None of above.
Provenance (6 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad857bb4c88190a4cf27893fcabed8 |
completed | March 8, 2026, 2:19 p.m. |
| NER | Named-entity recognition | batch_69ada1e98a1c8190b1dd4a0a47f7d6c6 |
completed | March 8, 2026, 4:20 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b1f89e6f5c8190993794e2c9977ee6 |
completed | March 11, 2026, 11:19 p.m. |
| NEDg | Description generation | batch_69b1f93d5b208190835093f453fd33ab |
completed | March 11, 2026, 11:22 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69b1f9ea9b908190a86e2b79a89e0283 |
completed | March 11, 2026, 11:25 p.m. |
| PD | Predicate disambiguation | batch_69ad9debb6308190be28378ae1fc98af |
completed | March 8, 2026, 4:03 p.m. |
Created at: March 8, 2026, 3:03 p.m.