Triple
T3083134
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New Melones Dam |
E64304
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hydroelectric facility |
C8942
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hydroelectric facility Context triple: [New Melones Dam, instanceOf, hydroelectric facility]
-
A.
hydroelectric dam
chosen
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
B.
water-powered mill
A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
-
C.
wind power facility
A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
-
D.
multipurpose dam
A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
-
E.
irrigation dam
An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad857bb4c88190a4cf27893fcabed8 |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:03 p.m.