Triple

T30802911
Position Surface form Disambiguated ID Type / Status
Subject Scala InfoChannel E784420 entity
Predicate instanceOf P0 FINISHED
Object multimedia content management system C9707 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multimedia content management system
Context triple: [Scala InfoChannel, instanceOf, multimedia content management system]
  • A. multimedia project
    A multimedia project is an integrated work that combines multiple forms of media—such as text, images, audio, video, and interactive elements—to communicate information or create an engaging experience.
  • B. media system
    A media system is an integrated framework of technologies, institutions, content, and audiences that produces, distributes, and regulates information and entertainment within a society.
  • C. video management platform
    A video management platform is a centralized system that enables users to upload, organize, store, stream, and analyze video content across devices and channels.
  • D. multimedia framework chosen
    A multimedia framework is a software infrastructure that provides tools, libraries, and services for processing, managing, and synchronizing various media types such as audio, video, images, and interactive content.
  • E. media container
    A media container is a digital file format that bundles together multiple types of media data—such as audio, video, subtitles, and metadata—into a single, structured package for storage and playback.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224b3a7ec819096939414d103e31e completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:42 p.m.