Triple
T30802910
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Scala InfoChannel |
E784420
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | digital signage software |
C58585
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: digital signage software Context triple: [Scala InfoChannel, instanceOf, digital signage software]
-
A.
digital signage company
A digital signage company provides hardware, software, and content management services to create, deploy, and remotely control dynamic digital displays for advertising, information, and branding in public and private spaces.
-
B.
signage system
A signage system is an organized set of visual elements and standards used to guide, inform, and direct people within physical or digital environments.
-
C.
display technology
Display technology encompasses the various electronic methods and devices used to visually present information, images, and video to users, such as LCD, OLED, and projection systems.
-
D.
large-format display
A large-format display is a high-resolution, oversized screen designed for presenting visual content to audiences in public, professional, or collaborative environments.
-
E.
banner system
A banner system is a framework for creating, managing, and displaying visual or textual banners across an application or website, often for announcements, promotions, or alerts.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224b3a7ec819096939414d103e31e |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:42 p.m.