Triple
T30797782
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Admiralty Signal Establishment |
E784278
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Royal Navy research establishment |
C40309
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Royal Navy research establishment Context triple: [Admiralty Signal Establishment, instanceOf, Royal Navy research establishment]
-
A.
Royal Navy shipbuilding establishment
A Royal Navy shipbuilding establishment is a naval facility dedicated to the design, construction, fitting out, and sometimes repair of warships and auxiliary vessels for service in the Royal Navy.
-
B.
Royal Navy station
A Royal Navy station is a geographically defined area or shore establishment from which Royal Navy forces are administered, supported, and directed for operations within a particular region.
-
C.
Royal Navy organization
chosen
A Royal Navy organization is a structured entity within the United Kingdom’s naval service responsible for planning, directing, and supporting maritime operations, personnel, and resources to achieve national defense and security objectives.
-
D.
Royal Navy training ship
A Royal Navy training ship is a vessel designated for the instruction and practical seamanship training of naval recruits, officer cadets, and specialist personnel.
-
E.
Royal Navy operational command
A Royal Navy operational command is an organizational unit responsible for planning, directing, and controlling naval forces and operations within a defined area or functional domain.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224b2e2a48190b19aa43db9da5b67 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:42 p.m.