Triple
T30727705
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Orpington Priory Conservation Area |
E782326
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Planning designation |
C3924
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Planning designation Context triple: [Orpington Priory Conservation Area, instanceOf, Planning designation]
-
A.
planning district
A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
-
B.
survey designation
A survey designation is a formal label or identifier assigned to a specific parcel of land or survey area to uniquely reference it in mapping, legal, and cadastral records.
-
C.
legal designation
chosen
A legal designation is an officially recognized status or classification assigned by law or regulation that defines specific rights, responsibilities, or characteristics of an entity or situation.
-
D.
landmark planning blueprint
A landmark planning blueprint is a strategic, visual, and documented plan that outlines the design, placement, significance, and long-term development of key landmarks within a geographic or urban context.
-
E.
designated area
A designated area is a specifically defined and marked space set aside for a particular purpose, activity, or group.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224ad9f9c81908e02a79ae0001137 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:37 p.m.