Triple

T3072216
Position Surface form Disambiguated ID Type / Status
Subject United States rocket program E64050 entity
Predicate instanceOf P0 FINISHED
Object rocket development program C12223 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rocket development program
Context triple: [United States rocket program, instanceOf, rocket development program]
  • A. prototype rocket
    A prototype rocket is an experimental launch vehicle built to test and validate new propulsion, structural, and control technologies before full-scale production or operational deployment.
  • B. human spaceflight program
    A human spaceflight program is an organized, long-term governmental or commercial initiative that designs, funds, and operates crewed missions beyond Earth’s atmosphere for exploration, research, and related objectives.
  • C. rocket engineer
    A rocket engineer is a specialized aerospace professional who designs, analyzes, tests, and improves rockets and their propulsion systems to ensure safe, efficient, and reliable space or missile missions.
  • D. satellite program
    A satellite program is an organized initiative that designs, builds, launches, and operates satellites to achieve specific objectives such as communication, Earth observation, navigation, or scientific research.
  • E. rocket booster
    A rocket booster is a powerful propulsion component that provides the initial thrust needed to lift a launch vehicle off the ground and accelerate it through the early stages of flight.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad857a8aec8190bfdfd9c14554ac5a completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:02 p.m.