Triple
T3071998
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sir Adam Beck Hydroelectric Generating Stations |
E64045
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | run-of-the-river hydroelectric power plant |
C12222
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: run-of-the-river hydroelectric power plant Context triple: [Sir Adam Beck Hydroelectric Generating Stations, instanceOf, run-of-the-river hydroelectric power plant]
-
A.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
B.
water-powered mill
A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
-
C.
multipurpose dam
A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
-
D.
wind power plant
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
E.
irrigation dam
An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad857a8aec8190bfdfd9c14554ac5a |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:02 p.m.