Triple
T30715667
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | joint operations command system of the People’s Liberation Army |
E782017
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | joint operations system |
C55191
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: joint operations system Context triple: [joint operations command system of the People’s Liberation Army, instanceOf, joint operations system]
-
A.
joint command
A joint command is a unified military authority structure that coordinates and directs operations involving multiple service branches or allied forces to achieve common strategic objectives.
-
B.
military operations center
A military operations center is a centralized facility where commanders and staff monitor, coordinate, and direct military activities and resources in real time.
-
C.
operations support system
An operations support system is a software platform that helps service providers monitor, manage, and optimize their network infrastructure and operational processes to ensure reliable service delivery.
-
D.
system of systems
chosen
A system of systems is a collection of independent, interoperable systems that collaborate to achieve capabilities and objectives that none of the individual systems could accomplish alone.
-
E.
joint military center of excellence
A joint military center of excellence is a specialized, multi-service institution that develops, integrates, and disseminates advanced doctrine, training, and best practices to enhance interoperability and effectiveness across the armed forces.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224acd24481908ed5f96f0d69b5dd |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:35 p.m.