Triple
T30708658
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Town of Gilboa |
E781825
|
entity |
| Predicate | primaryWaterResource |
—
|
GENERATED |
| Object | Schoharie Creek |
—
|
UNRECOGNIZED GENERATED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: primaryWaterResource Context triple: [Town of Gilboa, primaryWaterResource, Schoharie Creek]
-
A.
hasWaterResourceRole
Indicates that an entity participates in a water-related resource context with a specified functional role (e.g., source, user, manager, or regulator of water resources).
-
B.
primaryWaterways
Indicates that the related entities are connected through major or principal bodies of water, such as main rivers, canals, or shipping routes that serve as key waterways between them.
-
C.
waterSource
chosen
Indicates that one entity serves as the source or provider of water for another entity.
-
D.
waterResourceOrigin
Indicates the source or starting location from which a water resource is derived or originates.
-
E.
primaryHydrology
Indicates the main hydrological feature (such as a river, lake, or water system) that predominantly characterizes or influences a given area or entity.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224abfcf081909492e64d3cc35262 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:35 p.m.