Triple
T3067733
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | USCGC Commodore Barry (WHEC-34) |
E62146
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high endurance cutter |
C12208
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high endurance cutter Context triple: [USCGC Commodore Barry (WHEC-34), instanceOf, high endurance cutter]
-
A.
Turbostar family
The Turbostar family is a series of regional diesel multiple unit trains designed for short- to medium-distance passenger services, known for their modular construction and widespread use in the UK rail network.
-
B.
high-voltage generator
A high-voltage generator is a device that converts available electrical or mechanical energy into controlled, significantly elevated voltage levels for applications such as testing, research, and specialized industrial processes.
-
C.
heavy bomber
A heavy bomber is a large, long-range military aircraft designed to carry and deliver substantial payloads of bombs or missiles against strategic targets deep within enemy territory.
-
D.
heavy-lift helicopter
A heavy-lift helicopter is a large rotary-wing aircraft designed to transport exceptionally heavy cargo, equipment, or personnel, often in challenging environments and over relatively short distances.
-
E.
twin-engine helicopter
A twin-engine helicopter is a rotary-wing aircraft equipped with two independent engines that provide increased power, redundancy, and safety for missions such as transport, search and rescue, and offshore operations.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85793e5c8190a358049bc4a98d8c |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:02 p.m.