Triple

T3067733
Position Surface form Disambiguated ID Type / Status
Subject USCGC Commodore Barry (WHEC-34) E62146 entity
Predicate instanceOf P0 FINISHED
Object high endurance cutter C12208 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high endurance cutter
Context triple: [USCGC Commodore Barry (WHEC-34), instanceOf, high endurance cutter]
  • A. Turbostar family
    The Turbostar family is a series of regional diesel multiple unit trains designed for short- to medium-distance passenger services, known for their modular construction and widespread use in the UK rail network.
  • B. high-voltage generator
    A high-voltage generator is a device that converts available electrical or mechanical energy into controlled, significantly elevated voltage levels for applications such as testing, research, and specialized industrial processes.
  • C. heavy bomber
    A heavy bomber is a large, long-range military aircraft designed to carry and deliver substantial payloads of bombs or missiles against strategic targets deep within enemy territory.
  • D. heavy-lift helicopter
    A heavy-lift helicopter is a large rotary-wing aircraft designed to transport exceptionally heavy cargo, equipment, or personnel, often in challenging environments and over relatively short distances.
  • E. twin-engine helicopter
    A twin-engine helicopter is a rotary-wing aircraft equipped with two independent engines that provide increased power, redundancy, and safety for missions such as transport, search and rescue, and offshore operations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85793e5c8190a358049bc4a98d8c completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:02 p.m.