Triple
T30655414
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Circuito Interior Río San Joaquín |
E780372
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | part of ring road |
C19823
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: part of ring road Context triple: [Circuito Interior Río San Joaquín, instanceOf, part of ring road]
-
A.
radial road
A radial road is a major route that extends outward from a central point, such as a city center, to connect it with surrounding areas.
-
B.
part of city
A part of city is a spatially bounded urban area, such as a neighborhood or district, characterized by specific physical, social, or functional attributes within the larger city.
-
C.
road segment
A road segment is a continuous portion of a roadway between two defined endpoints, such as intersections or junctions, characterized by uniform attributes like direction, number of lanes, and speed limit.
-
D.
urban beltway
chosen
An urban beltway is a high-capacity circumferential highway or roadway system that encircles a city to route traffic around its core, reduce congestion, and connect radial routes and suburbs.
-
E.
east–west thoroughfare
An east–west thoroughfare is a primary transportation route or street that runs predominantly in an east–west direction, facilitating significant cross-town or regional movement.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224a5d2b481908a6853cd0138e2d7 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:30 p.m.