Triple

T3065200
Position Surface form Disambiguated ID Type / Status
Subject The Forum (planned development) E62088 entity
Predicate instanceOf P0 FINISHED
Object planned building complex C399 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned building complex
Context triple: [The Forum (planned development), instanceOf, planned building complex]
  • A. building complex chosen
    A building complex is a group of interconnected or related structures on a shared site that function together as a unified facility or environment.
  • B. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • C. office building complex
    An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
  • D. building section
    A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
  • E. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85793e5c8190a358049bc4a98d8c completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:02 p.m.