Triple

T3063972
Position Surface form Disambiguated ID Type / Status
Subject Lunar Gateway E62060 entity
Predicate instanceOf P0 FINISHED
Object NASA program element C1125 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: NASA program element
Context triple: [Lunar Gateway, instanceOf, NASA program element]
  • A. NASA mission component
    A NASA mission component is a distinct hardware, software, or operational element designed to perform a specific function that contributes to the overall objectives and success of a NASA space mission.
  • B. NASA space observatory program
    A NASA space observatory program is a coordinated series of space-based telescopes and instruments designed, launched, and operated to observe the universe across various wavelengths for scientific research and discovery.
  • C. NASA space mission
    A NASA space mission is a coordinated, goal-driven endeavor planned and executed by NASA to explore, observe, or utilize space using specialized spacecraft, instruments, and supporting ground operations.
  • D. human spaceflight program chosen
    A human spaceflight program is an organized, long-term governmental or commercial initiative that designs, funds, and operates crewed missions beyond Earth’s atmosphere for exploration, research, and related objectives.
  • E. NASA directorate
    A NASA directorate is a major organizational division within NASA responsible for planning, managing, and executing a specific domain of the agency’s missions, programs, and research activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85793e5c8190a358049bc4a98d8c completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:02 p.m.