Triple

T3060613
Position Surface form Disambiguated ID Type / Status
Subject Brantas River E60586 entity
Predicate hasDam P8736 FINISHED
Object Lodoyo Dam
Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
E331892 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lodoyo Dam | Statement: [Brantas River, hasDam, Lodoyo Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lodoyo Dam
Context triple: [Brantas River, hasDam, Lodoyo Dam]
  • A. Surobi Dam
    Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
  • B. Amawalk Dam
    Amawalk Dam is an early 20th-century masonry dam in Westchester County, New York, that impounds the Amawalk Reservoir as part of New York City's water supply system.
  • C. Harangi Dam
    Harangi Dam is a masonry dam built across the Harangi River, a tributary of the Kaveri, in Karnataka, India, primarily used for irrigation and water storage.
  • D. Sutami Dam
    Sutami Dam is a major multipurpose dam in East Java, Indonesia, used primarily for hydroelectric power generation, irrigation, and flood control on the Brantas River.
  • E. Bargi Dam
    Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Lodoyo Dam
Triple: [Brantas River, hasDam, Lodoyo Dam]
Generated description
Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lodoyo Dam
Target entity description: Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
  • A. Surobi Dam
    Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
  • B. Amawalk Dam
    Amawalk Dam is an early 20th-century masonry dam in Westchester County, New York, that impounds the Amawalk Reservoir as part of New York City's water supply system.
  • C. Harangi Dam
    Harangi Dam is a masonry dam built across the Harangi River, a tributary of the Kaveri, in Karnataka, India, primarily used for irrigation and water storage.
  • D. Sutami Dam
    Sutami Dam is a major multipurpose dam in East Java, Indonesia, used primarily for hydroelectric power generation, irrigation, and flood control on the Brantas River.
  • E. Bargi Dam
    Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8578137c81908259dcb27c7d6d7c completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69ad9e9e1e248190b5ed5ebcdad1321e completed March 8, 2026, 4:06 p.m.
NED1 Entity disambiguation (via context triple) batch_69b224b717e081909462645d78b33cc9 completed March 12, 2026, 2:28 a.m.
NEDg Description generation batch_69b22574e7c881908e9645f0869d95a8 completed March 12, 2026, 2:31 a.m.
NED2 Entity disambiguation (via description) batch_69b225f0e0b0819096f8b5f7e7ddd8c3 completed March 12, 2026, 2:33 a.m.
Created at: March 8, 2026, 3:02 p.m.