Triple

T3050863
Position Surface form Disambiguated ID Type / Status
Subject Strathclyde Partnership for Transport E83567 entity
Predicate instanceOf P0 FINISHED
Object regional transport authority C220 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional transport authority
Context triple: [Strathclyde Partnership for Transport, instanceOf, regional transport authority]
  • A. public transportation agency chosen
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • B. regional transport plan
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • C. mass transit operator
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • D. rapid transit division
    A rapid transit division is an organizational unit within a transportation agency responsible for planning, operating, and maintaining high-frequency, high-capacity urban rail or bus rapid transit services.
  • E. transport infrastructure operator
    A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b24924c8190a9bb6f61d519e4ae completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 3:01 p.m.